Product Details:
Payment & Shipping Terms:
|
Condition: | 100% New | Application: | Buildings And Projects |
---|---|---|---|
Type: | Fixed With Tower Head | Max. Load: | 10 T |
Jib Length: | 60 M | Tip. Load: | 2.4 T |
Power supply: | 380V/50Hz Or According To Client's Requirements | Mast section: | 1.833*1.833*2.5m Or 2*2*3m |
Electric Box: | Schneider | Power Supply: | 380V/50Hz, 415V/50Hz, 220V/50Hz Or According To Clients Need |
QTZ6024 60M 2.4T Hammer-head Crane Tower Building Construction Safety Equipment
Description
1) Working Radius (m): 65
2) Max. Load Capactiy (T): 10
3) Total Power (kw): 61.5 (not includes jacking-up system)
4) Power Supply: 380V/50Hz, 220V/60Hz or others
5) Base type: Well frame base/ cross base/ base with ballast
6) Optional parts (if you need them, please let me know in advance)
a. Anemometer
b. Air condition in cabin
c. Block box
d. Remote control
Specification
Rated Lifting Moment (KN.M) | 1600 |
Rated Loading Capacity (t) | 10 |
Max. Lifting Load (t) | 10 |
Tip Load (t) | 2.4 |
Max. Lifting Height (m) | 200 |
Free standing height (m) | 50 |
Rope length (m) | 500 |
Span (m) | 60 |
Working range (m) | 3 to 60 |
Slewing speed (r/min) | 0-0.6 |
Trolley peed (m/min) | 0-60 |
Jacking-up speed (m/min) | 0.4 |
Counter jib length (m) | 14.6 |
Power supply | 380V/50Hz or according to client's requirements |
Power Capacity (kw) | 61.5 |
Electric switch box | Schneider |
Main Material (mm) | 125*14 /two angle steel with rib or 200*20 |
Mast section (m) | 1.835*1.835*2.5 or 2*2*3 |
Outstanding Features
1. The tower crane is a combination of advanced technologies of the present day.
2. It is equipped with a hydraulic self-raising mechanismand afrequency-converting slewing mechanism.
3. The electric control system of the tower crane adopts the advanced “PLC + frequency converter” control mode of the present day, which has realized the stepless speed regulation and greatly improves the reliability, maneuverability and stability of the control system and the work efficiency of the tower crane.
4. The tower crane is equipped with all kinds of reliable safety devices, such as hoisting height limiter, slewing range limiter and multifunctional limiter to control the load moment, hoisting capacity and trolley traveling range.
Safety Device for hammerhead Tower Crane
1. 3 obstacle lights
2. Height limiter
3. Slewing limiter
4. Range/ trolley limiter
5. Weight limiter
6. Moment limiter
7. Anemometer and block box(optional)
Service
a. Rapid response to any inquiry(within 3 hours) and 24 hours on-line service.
b. Competitive price which directly work with factory. Welcome to visit us.
c. Professional inspection department to guarantee quality.
d. Engineers will go to construction site for guiding the installation and test-running for first time.
e. Easy-worn Spare parts is free supplied along with the tower crane.
f. 12 months super long time guarantee period.
Components
Tower cranes are used extensively in construction and other industry to hoist and move materials. There are many types of tower cranes. Although they are different in type, the main parts are the same, as follows:
Tower Crane Foundation
Tower Crane Mast Section
Tower Crane Climbing Frame
Tower Crane Table
Tower Crane Head
Tower Crane Luffing-Jib
Tower Crane Counter-Jib
Tower Crane Mechanism
Three Mechansims and full sets safety device
Pictures